a what is the capacity of the system and what is the bottleneck b what are the throughput times for batches of large and small tables c when producing at a rate of six small tables per hour on average how many tables will be in the system d draw

please i want good work and take this in my assignment

Any Assignment with high plagiarism OR late submission will be marked as 0

.Assignment format should be PDF

this what say my Dr

Application

Go to the page entitled “Problems” at the end of chapter 6 in the textbook (e-book).

Read the problem number 6, about the furniture factory, and answer the following questions.

  • What is the capacity of the system and what is the bottleneck?
  • What are the throughput times for batches of large and small tables.
  • When producing at a rate of six small tables per hour on average, how many tables will be in the system?
  • Draw the flowchart.

"Is this question part of your assignment? We can help"

ORDER NOW