Manufacturing overhead is under applied if actual overhead is less than applied.
Manufacturing overhead is under applied if:
(a)actual overhead is less than applied.
(b)actual overhead is greater than applied.
(c)the predetermined rate equals the actual rate.
(d)actual overhead equals applied overhead.