Group Project – Scope & Resources

SUPERIOR-PAPERS.COM essay writing company is the ideal place for homework help. If you are looking for affordable, custom-written, high-quality and non-plagiarized papers, your student life just became easier with us. Click the button below to place your order.


Order a Similar Paper Order a Different Paper

Hey there,

I have a small group project with some other students, and I have some tasks and I want you to do it. These tasks are:

Part 1: Scope:

Task 45. Develop, identify, and prepare the scope statement (Its limits- and objects that are not included)
Task 46. Develop, identify, and explain the concepts: Scope creep and giving examples

Task 47 .Illustrate product analysis management.
To illustrate the transformation of the work packages in Work Breakdown Structure to activities.

Part 2 :Resources:

Task 57. Explain the concept of Resource Leveling and Smoothing.
Task 58.Trained on distributing the project resources of equipment and tools.

When you write the paper, I want you to read all the PDF files asthey have valuable info about all the task.Thenfocus on the one that named “project”were you can find all the information about the two parts (Scope and Resources)

Below are some information I have taken from the file “Project” you need to read and get information and idea about what you can write in the paper:

1.Strategy
1.1. Mission
:
To providing integrated and comprehensive electrical support at the highest international levels.

1.2. Vision:
To be the preferred KSA leader in electrical services.
To fund the future expansions effectively for being partner of Saudi Electricity Company.
1.3. Smart Model

INITIAL GOAL

The main goal of the project is to achieve the business case of the project and deliver a successful product

S

SPECIFIC

The project team will achieve the company’s goal to become a leader in implementing projects for SEC with high voltage department by delivering a 33kV grid substation to feed metro station#02 in Riyadh City within specific time, cost, &scope as per project’s requirement.

M

MEASURABLE

The progress is successfully met when the milestones of the project have been delivered within same specified time of delivery 30-Oct-2021, cost as set 35million SAR, and the scope as required for 33kV Grid Substation.

A

ACHIEVABLE

This project will success because the team has the long experience in delivering mega projects. Also, they are PMP certified with a great knowledge, as well as the effort they can provide within project life cycle.

R

RELEVANT

This project’s goal is the success key for the company to open a business channel with SEC Company with high voltage department in building substations.

T

TIME-BOUND

The deadline of the project is 30-Oct-2021, which is affordable and can be done.

SMART GOAL

This project aims to open a business channel with SEC Company with high voltage department in building substations and purpose to align with the company vision and strategy for next 5 years in expanding business variation and with sustainable customers like SEC. With such qualified team, this will be a great achievement.

SCOPE DEFINITION

The scope of work for equipment shall cover engineering design, manufacture, testing before handing-over the substation to SEC or otherwise as required, delivery of site, of all equipment as specified in the preceding policies and procedures.
The substation shall have primary and backup feeding lines to feed metro station with capability not less than 30MVA for each line.

The Company shall design and construct the transformers foundations with oil collection pit, oil trap and fire damper consisting of crushed stones laying on a galvanized steel grating. The substation has a SCADA (Supervisory, Control & Data Acquisition) system that is controlled from the Regional Control Centers.

The Control Centers all run GE’s Alstom 4.6 which is the software used for monitoring & Controlling of all the incorporated substations.
The Communication protocols currently supported by PCU 400 Systems, for data telegram exchange with Remote Terminal Units (RTUs).


Note: I’ll Share the there PDF files later on with you.

Finally, please do the above tasks in less than 24 hours from now with an original and high-quality work as usual.

Writerbay.net

Got stuck with a writing task? We can help! Use our paper writing service to score better grades and meet your deadlines.

Get 15% discount for your first order


Order a Similar Paper Order a Different Paper
Writerbay.net